GameChange Racking

New York,  NY 
United States
http://www.gamechangeracking.com
  • Booth: 6314

GameChange Racking provides the industry’s best solar racking systems enabled by simple innovative design and large scale volume manufacturing. We are driven by providing the industry's best value and customer service.


 Products

  • GC Max-Span™ Post System
    Industry's best quality, test & certification and bankability Industry’s longest spans and fewest foundations - as few as 260 per MW Post/Beam/Brace assembly has industry’s lowest part count and fastest assembly...

    • Industry's best quality, test & certification and bankability
    • Industry’s longest spans and fewest foundations - as few as 260 per MW
    • Post/Beam/Brace assembly has industry’s lowest part count and fastest assembly
    • Rugged design enables 150 mph wind and 90 psf snow loads
    • Turnkey install and geo-tech services available
    • 20 year warranty - Made in USA
    • ETL / UL 2703 tested
    • Independent assessment by Black & Veatch
    • Wind tunnel tested by industry leader CPP
  • GC Grid-Lite™ Roof System
    Industry's best system to handle most severe seismic conditions: may be installed with or without attachments Interlocking grid design combined with Nextgen wind deflector reduces ballast to minimal or zero...

    • Interlocking grid design combined with nextgen wind deflector reduces ballast to minimal to zero
    • Fire proof, durable galvanized and stainless steel components
    • Minimal ballast when required on edges quickly installs with additional rail
    • Ultra high grade galvanized interlocking rails installs quickly to build grid
    • Industry's best system to handle most severe seismic conditions: may be installed with or without attachments
    • Unattached or attached system available for seismic areas (GameChange pioneered technology available in CA market in compliance with DSA and SEAOC)
    • Fast install with minimal components
    • Typical roof loading 0 to 1 psf for ballast; 2.5 - 3.5 total load including ballast, panels and racking
    • Less ballast and related labor reduce total installed cost
    • Full layout and engineering analysis for every project
    • Panel supports both 5 and 10º tilt
    • Snap-on EPDM blocks available in place of slip sheets
    • Unique design innovations protected under patent pending
    • Made in USA
  • GC Pour-in-Place™ Ballasted Ground System
    Patent pending protected system with self-leveling technology: 68% faster install than precast​ Substantial labor savings by eliminating moving and shimming heavy, precast blocks ...

    • Self-leveling technology: 68% faster install than precast​​​
    • Up to 4ft. high ground clearance to allow for snow slide and vegetation growth
    • Substantial adjustability allows for slopes up to 15%
    • Leave-behind patent-pending recycled HMWPE plastic Pour-in-Place™ forms
    • 2up to 3 ft high ground clearance to allow for snow slide and vegetation growth
    • Gen4 Pour-in-Place™ Ballasted Ground System with round forms shipping in Q4 2015 - less concrete, faster install, steeper slopes
    • Up to 25% less concrete due to optimized ballast distribution
    • Up to 12.5% slopes in all directions with no ballast supporting leveling material
    • Up to 17.5% in all directions wuth minimal ballast supporting leveling material
    • Rugged leave-behind NextGen round HMWPE plastic forms require no temporary bracing while pouring concrete
    • Available in both 1 and 2 panels up in portrait
    • Slots enables additional vertical adjustability, up to total of 10”
    • Continous configuration enables 10% grades
    • Custom tables available for extreme slopes up to 20% utilizing rail supports of varying heights
    • Integrated wire management tray on robust aluminum rails
    • 5 to 35° tilt with multiple inter-row spacing options
    • Full layout and engineering analysis for every project
    • Integrated grounding with star washers or teethed module clamps included - both approved under ETL to UL 467
    • 51% overall lower cost than competitors
    • Unique design innovations protected under patent pending
    • No gravel beds or other expensive ground preparations required – save up to $.05/watt
    • Precast foundations also available for $.035/w more than concrete poured into Pour-in-Place™ forms
    • Panels mount on robust aluminum rails – no risk of micro-fractures on panels that could occurs with settling with other racking systems where panels are not mounted on rails
    • Made in the U.S.A.
  • GC Power-Tracker™
    Superior engineered design with minimal components Fast installation with top mount panel attachment Both GameChange Pour-in-Place™ ballasted and pile driven foundation options...

    • Superior engineered design with minimal components
    • Fast installation with top mount panel attachment
    • Both GameChange Pour-in-Place™ ballasted and pile driven foundation options
    • Ideal for landfill as well as greenfield sites
    • Optimized rotational range of +/- 53.5º, Optional up to +/- 65º
    • Tru 3D-Gimbal™ patent pending technology self-aligns bearings, eliminating long term grinding wear, as well as allowing for fast pile installation with industry's best tolerances: +/- 5º plumbness, 2.5" vertical and 2" east-west
    • Panels rest easily onto purlin shelves and then attach from above with a single tool using teethed self-grounding panel clamps
    • Fail safe power-out mode locks entire array to withstand maximum design loads using 30 to 50 ton screw jack
    • All components engineered to withstand full design loads across entire rotational range: no low-tilt stow requirement
    • Self-lubricating HDPE UV proof bearings with aluminum pillow blocks have industry's longest 20+ year life due to self aligning gimbal mounts ensuring true alignment during install to prevent grinding bearings resulting from misalignment
    • Industrial reliability drive system and controller technology with decades of proven operational reliability in harsh environments
    • Array layout optimized for maximum energy yield at each site location by GameChange engineering
    • 20 year warranty on structural components, 5 year warranty on control & drive systems (up to 20yr. also available)
    • CPP wind tunnel tested and rated 120mph
    • ETL/UL 2703 testing process initiated
    • Black & Veatch technical assessment process initiated
For technical assistance please contact: Support@a2zinc.net

 

Sponsorship and Exhibit questions please contact: exhibit@solarpowerinternational.com